Introduction of Floor paint:
Floor paint is made from epoxy resin, modified resin, activity agent, additives, etc. The product is a long lasting anticorrosion paint, as well as high adhesive strength, tight structure, high impact resistant properties, seawater resistant, pulverization of salt resistant, chemical air resistant, etc. The floor paint can make the floor good looking and long time lasting; it can be used in workplaces such as hotel and station.

Floor paint:Technical indicators:

No. Item Experimental Reference PF-1
1 Gloss GB1743-79 88%
2 Adhesion GB1720-79 1
3 Hardness GB1730-79 0.76
4 Impact Strength GB1732-79 50cm
5 Flexibility GB1731-79 1mm
6 Wearability GB1768-79 9.7mg
7 Impact resistance B-30A Tester,30kg/m Good
8 Pressure experiments GT-200 Tester, 2500N/cm2 Good
9 Pull test GT-200 tester 290N/cm2
10 Pressure Forklift press for 50 times No change
11 Water resister GB1733-79, 7days No change
12 Pulverization of salt GB1771-79,1000h No change
13 brush TLXY Tester, 2000times No change
14 45# petrol GB1734-79, 30days No change
15 200#Petrol GB1734-79,30days No change
16 diesel oil GB1734-79,30days No change
17 Temperature 1050C to 50C, for 3cycles during 16h No change
18 H2SO4 GB1763-79, 20% H2SO4, 20days No change
19 NaOH GB1763-79, 20%, 30days No change

Specifications:
Color: many kinds
Specific Gravity: 1.32
Dosage: 0.35kg/m2
The Thickness: 180um (wet)
The Thickness: 60um (dry)
Ratio: 3:1 (A:B)
Application Time: 8hours, 25degree
Application Methods: bush, roll, spray
Diluents: Special
Surface Dry: 4hours, 23degree (±2degree)
Hard Dry: 24hours, 23degree (±2degree)
Solidify: 7days
The Interval between two washing:
48hours (shortest time), 15degree-25degree
30days (longest time), 15degree-25degree24hours (shortest time), 25degree-30degree
20days (longest time), 25degree-30degree
Duration period: 6months
Flash Point: 24degree

Formula 1: PF-1 Floor Paint

No. Items Specifications Thickness(um)
1 Closed layer Lacquer
2 Bottom layer Lacquer +1# filling 600-2400
3 Middle layer Lacquer +2# filling 300-500
4 Surface layer Glossy coating 100
Total thickness 1000-3000um

Formula 2:PF-2 Floor Paint

No. Items Specifications Thickness(um)
1 Closed layer Lacquer
2 Bottom layer Lacquer +1# filling 600-2400
3 Middle layer Lacquer +2# filling 300-500
4 Surface layer Glossy coating 100
Total thickness 1000-3000um

Notice:
You should prepare the following material before you paint.
a. H52-83 floor paint
b. H52-83 lacquer
c. H52-83 solvent
d. 1# filling, 2# filling
Ratio:
H52-82 lacquer (It made of two different parts): 3:2(A:B)
H52-82 paint (It made of two different parts): 3:1(A:B)

Formula 1:

PF-3 floor paint PF-3 lacquer 1# filling 2# filling PF-3 solvent
Closed layer 100 70-100
Bottom layer 100 380 10
Middle layer 100 100 5-10
Surface layer 100 Appropriate

Formula 2:

PF-4 floor paint PF-4 lacquer 1# filling 2# filling PF-4 solvent
Closed layer 100 70-100
Bottom layer 100 380 10
Middle layer 100 200 5-10
Surface layer 100 Appropriate

Floor:
a. The floor should meet the GB50209-95 Standard
b. the concrete floor should paint 3 weeks (summer) after finished, in winter need 6 weeks.
c. before painting the floor must flatted, clean and dry.
d. bottom layer is not allowed, unless the closed layer have painted for 30 minutes.
e. the pain can be painted 20 minutes after mixed, the dry time will last 24hours(23±2degree).
f. the pain can be painted 20 minutes after mixed, the dry time will last 24hours(23±2degree).
g. the pain can be painted 20 minutes after mixed, the drying time will last 7 days(23±2degree).
h. Painting is not allowed when temperature below 10 degree and humidity more than 85%.
i. Other substance is not allowed to mix into the paint, and the paint should be use up to 4 hours.
j. Dangerous material, please keep it safe.
k. Please read the introduction carefully before use.